27th September 2023
- Correct error in an equipment and consumable snippet regarding input recommendation for the library preparation
19th September 2023
- Updated flow cell loading instructions to include light shield installation
- Updated flow cell loading recommendations in the "Adapter ligation and clean-up" step.
26th June 2023:
- Instrument name standardised throughout protocol to Hamilton NGS STAR 96
- Updated equipment for discontinuation of the Roche Diagnostics MagNA Pure LC Medium Reagent Tubs 20 to Hamilton 20 ml Reagent Reservoirs
May 2023:
- Included guideline protocol for loading multiple PromethION Flow Cells
- This kit has moved to released phase.
March 2023:
- Included guideline protocol for loading multiple PromethION Flow Cells
March 2023:
- Updated the "Sequencing and data analysis" section to include further details about duplex basecalling
January 2023
- Changed the "Priming and loading the PrometION flow cell" section to the updated version.
03 October 2022:
- Corrected Priming and Loading flow cell section of the protocol to link to the PromethION rather than the Min/Grid section.