27th September 2023
- Correct error in an equipment and consumable snippet regarding input recommendation for the library preparation
19th September 2023
- Updated flow cell loading instructions to include light shield installation
- Updated flow cell loading recommendations in the "Adapter ligation and clean-up" step.
26 July 2023:
- Formatting updates.
- Addition of disclaimer section to the protocol including information on research use only and Tecan Group Ltd. disclaimers.
26 June 2023:
- Updated equipment and consumables list with manufacturers recommendations.
- Formatting updates.
- Inclusion of additional tips and recommendations throughout protocol.
- Addition of research use and Tecan disclaimers to the Overview of the protocol.
- Addition of new "Unloading the Tecan DreamPrep NGS worktable" step in the "Automated library preparation" section.
02 June 2023:
- Updated equipment and consumables list with manufacturers recommendations.
- Formatting updates.
- Inclusion of additional tips and recommendations throughout protocol.
02 June 2023:
- Updated equipment and consumables list with manufacturers recommendations.
- Formatting updates.
- Inclusion of additional tips and recommendations throughout protocol.
May 2023:
- Included information for using the loading multiple PromethION Flow Cells protocol
- This kit has moved to released phase.
March 2023:
- Included information for using the loading multiple PromethION Flow Cells protocol
March 2023:
- Updated the "Sequencing and data analysis" section to include further details about duplex basecalling