12th July 2023
- Updated product legacy availability
March 2023
- Includes information to use the Loading multiple PromethION Flow Cells as a guideline.
February 2023
- Updated product phase to 'Legacy'
11th January 2023
- Update the priming and loading the SpotON flow cells for PromethION with new diagrams and structure.
14th April 2022
Protocol name change
14th April 2022
Protocol name change
October 2021
- Clarified R10.3 flow cell loading recommendations
13th Sept 2021
- Added table outlining kit contents in the Equipment and Consumables section.
10th June 2021
In the PromethION branch of the protocol, "Priming and loading multiple flow cells on a PromethION" step:
- Added a note to wait 20 minutes after taking the flow cells out of the fridge, and wiping off any condensation before inserting the flow cells into the device
- Added a note about correct insertion of the flow cell to avoid damaging the pins
28th April 2021
- Updated the PromethION branch 'Priming and loading multiple flow cells on a PromethION' section to ensure DNA libraries are prepared with SQB and LB individually, without combining non-barcoded samples together.
9th Dec
Compatibilities updated for EXP-WSH004
4th Nov
DNA repair and end-prep step vol corrected
21st Feb 2020
Added 'Library storage recommendations' snippet before flow cell loading step
21st Feb 2020
Added 'Library storage recommendations' snippet before flow cell loading step