12th July 2023
- Updated product legacy availability
February 2023
- Updated product phase to 'Legacy'
11th January 2023
- Update the priming and loading the SpotON flow cells for PromethION with new diagrams and structure.
July 2022
- Update the priming and loading the SpotON flow cells for both MinION and GridION with new diagrams.
14th April 2022
Protocol name change
27th January 2022
- Updated mixing recommendations and adding tips regarding short term storage of the DNA library during the prep
In "Priming and loading the flow cell", further tips/notes have been added regarding preparing the library and flow cell loading.
23rd Sept 2021
- Updated compatibilities snippet in the 'Overview of the protocol' to include R10.3 flow cells
- Updated flow cell loading recommendations
13th Sept 2021
- Added table outlining kit contents in the Equipment and Consumables section.
10th June 2021
In the PromethION branch of the protocol, "Priming and loading the flow cell" step:
- Added a note to wait 20 minutes after taking the flow cells out of the fridge, and wiping off any condensation before inserting the flow cells into the device
- Added a note about correct insertion of the flow cell to avoid damaging the pins
8th Dec
Compatibilities updated to EXP-WSH004
28th January 2020
Added an optional instruction in the PromethION branch of the protocol for setting aside 1 µl of library for performing a QC experiment using Flongle