28th February 2024
- Updated the flow cell washing instructions with the new method: addition of prepared wash mix done in 2x 200 µl steps with a 5 minute pause in-between.
19th September 2023
- Updated all library transfer methods to include light shield installation instructions.
17th July 2023
- Updated the P2 flow cell loading images.
March 2023
- Updated "Clean up and transfer a library between flow cells" to include instructions for preparing the recovered library post-clean up
February 2023
- Updated checklist format
February 2023
- Updated recommendations to avoid transferring short fragment libraries
25th January 2023
- Added in two new methods for both MinION and PromethION flow cells:
- "Clean up and transfer a library between flow cells"
- "Recover a library to replace on a washed flow cell"
- Updated the "Overview of the protocol" and "Equipment and consumables" to include relevant information for the new methods included.
January 2023
- Updated the protocol overview to clarify this is only compatible with MinION and PromethION flow cells.