07th March 2024
- Updated library loading recommendations to 35-50 fmols.
2nd October 2023
- Updated "Adapter ligation and clean-up" to remove additional reference of NEBNext® Quick Ligation Reaction Buffer (NEB, B6058)
19th September 2023
- Updated flow cell loading instructions to include light shield installation
- Updated flow cell loading recommendations in the "Adapter ligation and clean-up" step.
14th August 2023
- Updated the equipment and consumables with both formats of kits which are being shipped.
- Updated the native barcoding ligation step to include instructions for both EDTA concentrations.
- Updated flow cell flushing instructions to include instructions for the bottle format kit.