07 March 2024
- Updated protocol to inlcude Adapter Buffer (ADB) beside the RAP Dilution Buffer (RDB) to account for new kit batches with replaced reagent.
December 2023
- Updated product phase to 'Legacy'
19th September 2023
- Updated flow cell loading instructions to include light shield installation
March 2023
- Updated sequencing and data analysis to be aligned with our standard recommendations
January 2023
- Changed the PromethION "Priming and loading the flow cell" section to the updated version.
December 2022
- Updated overall protocol timing in the introduction and have added tips throughout the protocol
December 2022
- Included instruction for using RNA Control Sample to run a control experiment
- Added tips throughout the protocol explaining the function of the reagents through the workflow
20th June 2022
- Update the priming and loading the SpotON flow cells for both MinION and GridION with new diagrams.
25th May 2022
- Protocol overview workflow image updated