29th June 2023
- Moved and reformatted the required MinKNOW settings from the "Priming and loading a flow cell" sections into "Data acquisition and basecalling".
- Ensured MinKNOW barcode settings are consistent with our recommendations in the "downstream analysis" section.
3rd May
- Updated the Midnight Primer sequences to include the V3 primer spike-ins
March 2023
- Included information for using the Loading multiple PromethION Flow Cells as a guideline
February 2023
- Removed the checklist download to fix formatting issues.
11th January 2023
- Update the priming and loading the SpotON flow cells for PromethION with new diagrams and structure.
11th January 2023
- Update the priming and loading the SpotON flow cells for PromethION with new diagrams and structure.
20th June 2022
- Update the priming and loading the SpotON flow cells for both MinION and GridION with new diagrams.