12th July 2023
- Updated product legacy availability
February 2023
- Updated product phase to 'Legacy'
9th August 2022
- Added information about the RAP Top-Up kit in the Equipment and Consumables section as well as splitting libraries in the Library Prep section.
21th June 2022
- Update the priming and loading the SpotON flow cells for both MinION and GridION with new diagrams.
14th April 2022
Protocol name change
24th June 2021
In the Flongle branch of the protocol, "Loading the Flongle flow cell" step, an amendment has been made to step 8: "Loading Beads II (LBII) mixed immediately before use, or Loading Solution (LS), if using. LS can be used instead of LBII when preparing libraries with the Ligation Sequencing Kit (SQK-LSK110)"
24th June 2021
In the Flongle branch of the protocol, "Loading the Flongle flow cell" step, an amendment has been made to step 8: "Loading Beads II (LBII) mixed immediately before use, or Loading Solution (LS), if using. LS can be used instead of LBII when preparing libraries with the Ligation Sequencing Kit (SQK-LSK110)"
24th June 2021
In the Flongle branch of the protocol, "Loading the Flongle flow cell" step, an amendment has been made to step 8: "Loading Beads II (LBII) mixed immediately before use, or Loading Solution (LS), if using. LS can be used instead of LBII when preparing libraries with the Ligation Sequencing Kit (SQK-LSK110)"