-
Shutting down your PromethION 24/48
The PromethION Data Acquisition Unit requires a stepwise, processed shut down, otherwise you may face problems e.g. when recognising flow cells.
Follow the instructions in this section to ensure you do not face errors with your PromethION from incorrectly shutting down your device.
-
Remove all flow cells from the device.
-
Select Shutdown.
-
Click Shut Down in the pop-up to confirm.
-
Switch off the Sequencing Unit using the switch on the back of the device.
-
Turn off the device at the mains supply, if you are using mains power.